![]() |
#11
|
|||||
|
|||||
![]() Ugh ya, another member spit.fire actually offered to drill for me too but at this point the plumbing is complete and I don't want to have to alter it again especially with the added costs of replumbing. I will be adding float switches inside the overflow and the main tank to my RKE for another level of redundancy. Could I ask you what bad experience you had with one. Whenever someone tells me they had a bad experience with HOB I have been asking about the experience to see if I can failsafe it further. This is just a starter tank for me and I'm sure within couple of years I'll be upgrading again and I'll make sure to have it drilled next time before I get building.
__________________
Budget doesn't exist in this hobby: 45G Build Clam Specific IM Lagoon 25G Build -Brian Last edited by Etaloche; 01-11-2016 at 07:58 PM. |