![]() |
#32
|
|||||
|
|||||
![]() Then i got started on the glass that needs to be drilled and cut for an overflow and wave box, then the plumbing!
The hole for the wave box ![]() Next is my return line ![]() Then the overflow, untill i realized that i needed a new dremel bit to cut the glass ![]() soooooo then i moved on to the plumbing! ![]() ![]() ![]() ![]() |
Tags |
bowfront, custom, exposed rock, tunze, wavebox |
|
|