![]() |
|
#1
|
|||||
|
|||||
![]() Congrats on the new box of water. With all that coin you are dropping at BC Ferries no wonder you left without the MP40.
![]() |
#2
|
||||
|
||||
![]() Congrats on convincing her. One of the nicer tanks I have seen on here...so jealous. What a steal.... trust me when I say I am pouting.
![]() Can't wait to see this come together for you. |
#3
|
|||||
|
|||||
![]() Well, I was able to get some help and bring the tank into the basement where I'll work on it.
Preclean: ![]() Post cleaning: ![]() |
#4
|
|||||
|
|||||
![]() The tank originally comes with the 2 internal overflows. The drains are 1" durso's and 3/4" returns. I want to go with the herbie design though.
On my existing system I was stuck with existing holes and am actually running a 1 1/4" full siphon but at the bulkhead it reduces down to 3/4". I had originally run the 3/4" all the way but it couldn't keep up to the flow demand. That's when I used bushings to increase it to 1 1/4" on both sides of the bulkhead and it ended up being a bit overkill. My gate valve is probably only about 25% open. So on this tank I'm thinking of using the 3/4" holes for my siphon but increased to 1" on either side of the bulkhead and use the 1" holes for my safety drains increased to either 1 1/4" or 1 1/2". I really don't like the over the rim returns on my existing tank so I'm thinking of drilling 3 or 4 - 3/4" returns in the back of the tank. I did this with my cube and really like the results - it looks nice and clean. I've been able to drill the MIP-Locline adapter and have no issues with back siphoning when the power goes out. But it is only a 20 gallon cube, not a whole lot of pressure. If I drill the 3/4" holes as high as I can get them (which is roughly 1/2" down from the black plastic rim on the top of the tank) I'll be about 2 1/2" down from the top of the glass to the edge of the hole. And I was originally thinking 4 holes, 1 on either side of both overflow boxes. But I suppose I could get away with only 2 holes on the right side of the left overflow and the left side of the right overflow. The factory returns come with a splitter on them so in essence there is 4 returns anyway. Anybody see any issues with drilling that many holes? Or should I just go with the 2? |
#5
|
|||||
|
|||||
![]() The other question I had (it just came back to me) is for those running dual siphon's. Is it hard to balance? Should I be tying them together and controlling with one gate valve? I know if I do it that way all the piping has to be exactly the same length, but it seems better to have redundancy with 2 separate drains. Just not sure how hard it will be to balance. What think you?
|
#6
|
|||||
|
|||||
![]() Any thoughts as to structural integrity of drilling 2 - 3/4" holes on the back pane 2 1/2" down from the rim?
|
#7
|
|||||
|
|||||
![]() drill slowly and carefully very little pressure and go with 4 return holes thi way you can adjust flow to dead areas your powerheads arent covering. try to design your return manifold insuch a way that yuo can have a syphon break to reuduce amount of back flow to sumpinpowerr failure
__________________
Desperately seeking serenity ... 180g custom build http://www.canreef.com/vbulletin/showthread.php?t=81400 50g custom daycare tank... http://www.canreef.com/vbulletin/showthread.php?t=65428 |