![]() |
|
#1
|
||||
|
||||
![]() Quote:
Well, after talking to Jeff at J&L, a knowledgeable guy I trust at a LFS here, I decided to go with one big sump, and some partitions they sell to divide the sump into sections for fuge etc. But water flows through them. Sump is 72*30*24, an old acrylic tank. The tank bulges a lot, so it’s tough to cement in baffles to create a stable section where the water level stays the same. But I can see how useful that would be. I have all the materials, may have to try that. Tom |
#2
|
||||
|
||||
![]() So, I bought the big hammerhead in order to both feed the DT, and to tee off the return line to feed a fuge, and possibly a carbon Reactor, and a UV unit. I can see that would make dialing in the system very very tricky.
I have the tee in there, shut off for now with a TUBV. May have to just feed the fuge off this, and nothing else. molotov, those 1" gate valves aren't too pricey. I am finding it very usefull to mark the valve with a magic marker, and turn 1/8 or so at a time, on both the pump return and the drain. I had planned on using the TUBV only on the fuge, but another gate valve will definitely go in there. Tom |