![]() |
|
#1
|
|||||
|
|||||
![]() Prep work for the drilling
![]() ![]() ![]() The fun begins ![]() ![]() One done....8 to go ![]() ![]() ![]() ![]() 2 hours later....bulkheads ready to go in! ![]() ![]()
__________________
Getten Outta Dodge Last edited by Quinster; 01-25-2007 at 04:06 PM. |
#2
|
|||||
|
|||||
![]() R2D2?
![]() Got the rough in done...going to get the teflon tape and finish it up! Next the tank plumbing!
__________________
Getten Outta Dodge |
#3
|
|||||
|
|||||
![]() overflow and bottom plumbing installed in the new tank...
![]()
__________________
Getten Outta Dodge |
#4
|
|||||
|
|||||
![]() oops, try again....
overflow and bottom plumbing installed in the new tank... ![]()
__________________
Getten Outta Dodge |
#5
|
|||||
|
|||||
![]() Old tank gone....
![]() Cutting the stand and moving bracing for all the new plumbing ![]() ![]() prepping for the lift ![]() ![]() Did you know 2 people can lift a 1/2" 180 gallon, just your legs get shorter and arms longer...Right Tbone (Trev)? ![]() Plumbing the 4 Way and Dart ![]() ![]() ![]() Water testing for leaks ![]() Dart running ![]() ![]() ![]() and 1/2 full with sand and live rock ![]() got it 3/4 full last night, just have to finish the plumbing to the sump and return pump...
__________________
Getten Outta Dodge |
#6
|
|||||
|
|||||
![]() Lighting being installed in the canopy...new reflectors
![]() ![]() ![]() ![]() ![]() and finally....let there be light! ![]() NEW OM Omni Flex Nozzles ![]() ![]() with flash ![]() ![]() ![]() top down ![]() ![]() inside canopy ![]() ![]()
__________________
Getten Outta Dodge |
#7
|
|||||
|
|||||
![]() Sweet looking tank. How did you do the 2 returns in the front?
What are the covered with?
__________________
Enquiring minds want to know… ![]() |