![]() |
|
|
|
#1
|
|||||
|
|||||
|
Got my drawers built. Still missing the right glide for the lower left drawer (got 2 lefts instead of a right and a left) so that's why it looks a bit off kilter. Got the top doors mounted with the hold up hardware. Still have to spray all the doors, hopefully that'll happen this week.
Today I concentrate on plumbing the tank to sump and see if I can't get that done. ![]() ![]() |
|
#2
|
|||||
|
|||||
|
took me a while but i got caught up on your build and you've been BUSY! love how things are progressing. That metering pump is a great idea... no worrying about calibration drifting on two seperate dosing channels.
cute broom btw. |
|
#3
|
|||||
|
|||||
|
looking good buds
__________________
180 starfire front, LPS, millipora Doesn't matter how much you have been reading until you take the plunge. You don't know as much as you think. |
|
#4
|
|||||
|
|||||
|
Your woodworking skills are amazing, that stand/cabinet is top notch!
|
|
#5
|
|||||
|
|||||
|
Thanks guys! Helps knowing people are even reading this, lol
![]() Got the rest of the doors on and all but the one drawer front. A bit cool on the island this week (-10 here this morning brrrrrrr) and the only make up air for the spray booth exhaust in the shop I spray at is opening the door to outside. Sooo, probably not going to happen this week.Also got all the plumbing upstairs done, now just have to deal with the fish room. ![]() ![]() |
|
#6
|
||||
|
||||
|
Just read the whole thread. Just awesome!
You have skills! Following along, keep up the excellent work |
|
#7
|
||||
|
||||
|
Wow awesome!!!
|