![]() |
|
#1
|
|||||
|
|||||
![]() well got all the holes drilled and the bulkheads installed. main tube is glued on and routed out, also got the becket foam tubes made (well 1/2 made anyways)
![]() ignore the small tube ontop.. was just using a chunk of dirty 4" to get a feel for the hight. I will be using 6" for the actual riser. ![]() Steve
__________________
![]() Some strive to be perfect.... I just strive. |