![]() |
|
#1
|
||||
|
||||
![]() id wait an hour before i pressurized it checking the flow down to the sump an hour is plenty but id wait a day before i checked the return piping
__________________
250G DD LED SPS R.I.P. 180G LED SPS 80"x36". 300G custom build Owner of Mountain Ridge Heating and Gas Class A gas fitter, HVAC |
#2
|
|||||
|
|||||
![]() I've allways run in a hr, drain and return.
__________________
Dan Pesonen Umm, a tank or 5 |