![]() |
|
||||||||
| Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
|
|
Thread Tools | Display Modes |
|
|
|
#1
|
||||
|
||||
|
I built my stucture with fijicrete and moved it after, but I used zip ties to hold it until it was cured then cut most of them off. I left a few zip ties hidden in the rock work for insurance and also there is an arcylic rod supporting some of it. When I drilled my rock I used a masonry bit and used a regular half inch drill and went really slow and let the bit do the work. I tested drilling the rock on a few extra pieces before i did my main structure.
|
| Thread Tools | |
| Display Modes | |
|
|