![]() |
|
||||||||
| Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
|
|
Thread Tools | Display Modes |
|
#11
|
||||
|
||||
|
Hmmm.
3/4" ID tubing, going from the mag 7 in the sump to the chiller (about 2' run) then from the chiller to the UV unit (16-18" run) and then from the UV to the sump (2.5' run). I really didnt think my last post thru very well ![]() I should measure the output of that. |
| Thread Tools | |
| Display Modes | |
|
|