![]() |
|
#1
|
|||||
|
|||||
![]() R2D2?
![]() Got the rough in done...going to get the teflon tape and finish it up! Next the tank plumbing!
__________________
Getten Outta Dodge |
#2
|
|||||
|
|||||
![]() overflow and bottom plumbing installed in the new tank...
![]()
__________________
Getten Outta Dodge |
#3
|
|||||
|
|||||
![]() oops, try again....
overflow and bottom plumbing installed in the new tank... ![]()
__________________
Getten Outta Dodge |
#4
|
|||||
|
|||||
![]() Old tank gone....
![]() Cutting the stand and moving bracing for all the new plumbing ![]() ![]() prepping for the lift ![]() ![]() Did you know 2 people can lift a 1/2" 180 gallon, just your legs get shorter and arms longer...Right Tbone (Trev)? ![]() Plumbing the 4 Way and Dart ![]() ![]() ![]() Water testing for leaks ![]() Dart running ![]() ![]() ![]() and 1/2 full with sand and live rock ![]() got it 3/4 full last night, just have to finish the plumbing to the sump and return pump...
__________________
Getten Outta Dodge |
#5
|
|||||
|
|||||
![]() Lighting being installed in the canopy...new reflectors
![]() ![]() ![]() ![]() ![]() and finally....let there be light! ![]() NEW OM Omni Flex Nozzles ![]() ![]() with flash ![]() ![]() ![]() top down ![]() ![]() inside canopy ![]() ![]()
__________________
Getten Outta Dodge |
#6
|
|||||
|
|||||
![]() Sweet looking tank. How did you do the 2 returns in the front?
What are the covered with?
__________________
Enquiring minds want to know… ![]() |
#7
|
|||||
|
|||||
![]() Looking great Quinn!
I hope you don't mind i moved your thread to the Tank Journal Forum. ![]() |
#8
|
|||||
|
|||||
![]() Cool!
What's the timeframe from the 1st photo to the last?
__________________
-- Tony My next hobby will be flooding my basement while repeatedly banging my head against a brick wall and tearing up $100 bills. Whee! |
#9
|
|||||
|
|||||
![]() Thanks all for the reply's...
Quote:
It was a lot longer than I wanted it to be, especially with my old 180G sitting there with bar clamps holding it together...not visually pleasing, or comforting for that reason. In total I think it was 2 1/2 - 3months. There were some setbacks due to some errors when the tank was manufactured, as well as plans changing with the closed loop design, but in all, very happy with the change, no matter how long it took.
__________________
Getten Outta Dodge |
![]() |
Thread Tools | |
Display Modes | |
|
|