Me and my Father developed our basement a couple years ago and we never got any permits, but we did have a friend who was an electrition check all or wiring before we connected the power. Its not a hard DIY if you have a few extra hands, the hardest part i found was caring the drywall into the basement, and taping mudding the drywall, that was horribbly dusty.
__________________
Sean

Back in the good ole days
Reply With Quote
  #12  
Old 09-18-2006, 07:52 PM
muck's Avatar
muck muck is offline
Member
 
Join Date: Mar 2004
Location: Edmonton, AB (West)
Posts: 4,329
muck is on a distinguished road
Default

If I lived closer I'd help you with the electrical Tony.
Reply With Quote
  #13  
Old 09-19-2006, 03:15 AM
Dez's Avatar
Dez Dez is offline
Member
 
Join Date: Mar 2002
Location: Edmonton
Posts: 1,793
Dez is on a distinguished road
Default

Tony,

My basement is in the process of getting to the finishing stages now. I got my own permits and did my own drawings. I found some contractors myself and did a lot of it with my own bare hands.

For electrical, I just got a friend to guide me in doing it the right way, and the electrical inspection before the drywall went up was no problem.

You don't need a permit for plumbing if you have your toilet roughed in (at least that's what the city told me when I got my permit.

I just did all the plumbing myself and leak tested it before closing it in.

Anyway, hope this helps.

Des
Reply With Quote
  #14  
Old 09-19-2006, 07:35 AM
mark's Avatar
mark mark is offline
Member
 
Join Date: Nov 2002
Location: Edmonton AB
Posts: 4,212
mark is on a distinguished road
Default

After having a few problems with my new house (build by a contractor) and dealing with City of Edmonton inspectors if you're doing the development yourself and know what you're doing I see little value in an permit/inspection. Having a contractor doing it definitely, because you might have recourse if something goes wrong.

Never heard of anyones insurance being void if there was a problem with no inspection and all that will happens is your taxes will go up.

If you do go the permit route drawings are not big deal, basically a sketch on 1/4" graph paper is all they're looking for (at least in Edm). The Edmonton City site has some good links and I assume Calgary would have same.
http://http://edmonton.ca/portal/ser...ent+Permit.htm

http://http://edmonton.ca/portal/ser...0/basement.pdf

Now my rant time with inspectors though
- The Safety (Occupancy) Inspector was on site when I was at the house, signed the deck off (railing height, spacing between spindles okay) although all the lumber was still on the ground in a bundle. Also sighed off ready to occupy though only heat was a electric space heater and no hot water as no gas meter
- Vapour barrier was just run up the just above the top of the studs in the basement (not over the insulation in the joist cavities nor secured to the subfloor). I removed some of the batting and found mould, contacted the builder told was passed by the City. Called the City, they came over and was told yes the vapour barrier was not correct but I had high humidity and though the vapour barrier was not installed correctly I told I was naive if I expected to have everything to code. Ended up talking to his supervisor, told if I wanted to be a a$$hole and pursue it I would need the hire a engineer and submit a report. Then told since it was a not to code and they had a record of the defect and they knew the builder wouldn't do anything they would them come after me until it was done to their complete satisfaction.
Reply With Quote
  #15  
Old 09-24-2006, 05:25 PM
DiscusZ DiscusZ is offline
Member
 
Join Date: Sep 2003
Location: Calgary, Alberta
Posts: 294
DiscusZ is on a distinguished road
Send a message via Skype™ to DiscusZ
Default

I am pretty sure you need a permit, it helps when you go and sell your house later on (I could be wrong but this is what I have been told) and if something happens (you wire something wrong and the house burns down) at least you have a leg to stand on.


My taxes did not go up by a lot..
__________________
Setup: 180G DT, 105G Refuge (approx. 300lbs LR, 150lbs Aragonite)
Hardware: Super Reef Octopus SSS-3000, Tunze ATO, Mag 18 return, 3x MP40W, 2X Koralia 4's Wavemaker
Lighting: 5ft Hamilton Belize Sun (2x250W MH, Blue LEDs) Vertex Calcium Reactor 2x Deltec Pellet Reactors
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 01:25 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.