![]() |
|
Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
![]() |
|
Thread Tools | Display Modes |
|
#1
|
||||
|
||||
![]() Pardon my ignorance but if you predrill holes for the future and then I presume you add some sort of stopper. How do you add the equipment at a latter date with out popping out the stopper and having water run out? I am in the midst of looking at getting a 50G tank with a sump etc and I am interested in this also. The above link is good help.
Thanks |
![]() |
Thread Tools | |
Display Modes | |
|
|