![]() |
#7
|
|||||
|
|||||
![]() You'll need constant flow streams over the bottom to stop anything from settling, this can be fairly difficult to achieve and requires a lot of flow. It also helps if the rock work is suspended in a way that as little rock is in contact with the base as possible.
|
Thread Tools | |
Display Modes | |
|
|