![]() |
#12
|
|||||
|
|||||
![]() Cool stuff.
![]() You could always double-up a 2x6 or 2x8 in behind the front beam maybe if you wanted to keep the area brace free.. I built the stand for my 280g using a 2x6 and a 2x8 doubled up to cover the span and when I had water in the tank I measured for any signs of deflection and could not find anything even after 2 months. I'm not a structural engineer though so I'm not sure if there's a better criteria.
__________________
-- Tony My next hobby will be flooding my basement while repeatedly banging my head against a brick wall and tearing up $100 bills. Whee! |
Thread Tools | |
Display Modes | |
|
|