![]() |
|
Portal | PhotoPost Gallery | Register | Blogs | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
![]() |
|
Thread Tools | Display Modes |
|
#1
|
||||
|
||||
![]() dosing pump no 4 you have 0 for dosing days, so it wont dose anything.
|
#2
|
||||
|
||||
![]() Thanks, but..
No, the unit number 4 I still do not use it. But, unit 1 started to 00:00 hours unit 2 started to 00:07 hours unit 3 started to 00:15 hours all perfect one. The hour can be changed to start? Thanks |
#3
|
||||
|
||||
![]() Hi
in dosing mode the start time can't be changed, the times are calculated automatically. If you want to dose at specific times you have to use a timer instead of the dosing function. |
#4
|
||||
|
||||
![]() thanks.
|
#5
|
||||
|
||||
![]() hello,
I have another question (I want to connect two tunze 6055): I have connected to L1/L2 the module EVG-AP 2F with a single dimmable balasts (L1) and free L2. To L3/L4 I have connected MoonWB (L3) and free L4. If I buy the module YL2-1 (connected to L3/L4), I can connect MoonWB and a tunze 6055. how can I connect the other tunze? thank you |
#6
|
||||
|
||||
![]() you need 2 splitters and 2 cables "ProfiLux-Tunze 2".
Then L2 would be one pump, L4 the other. Of course the second channel of your EVG-AP would work synchronously to the pump which is connected to L2, but this is not a problem. If you don't want this you should insert a card with extra 1-10V-interfaces like the PLM-2L4S or PLM-4L. |
#7
|
||||
|
||||
![]() Thank you
Last edited by egareef; 12-20-2007 at 09:10 AM. |
![]() |
Thread Tools | |
Display Modes | |
|
|