![]() |
#17
|
|||||
|
|||||
![]() Yeah slab is poured and drains are in place, no framing yet. The builder will do the framing for me, but that's all, after that it's all me! I see lots of work ahead of me!
Here is the proposed layout. Last edited by Seth81; 10-01-2015 at 10:48 PM. Reason: Fixed pic |