![]() |
#6
|
||||
|
||||
![]() After the drills were done the sump was slid into place. The chamber on the far right where the overflow water initially returns houses the skimmer, then a chamber for live rock, a chamber for a six inch DSB lagoon and then the return pump chamber with heaters and dual carbon/GFO reactor.
|