![]() |
#11
|
|||||
|
|||||
![]() Stand built, foam layed and tank is now on the stand!
Next is paint touch up and plumming! The front of the stand will eventually be built into the wall. I want it to look like a clean ledge. ![]() Last edited by waynemah; 07-11-2011 at 05:08 AM. |