Quote:
Originally Posted by shiftline
Did you peel the rock apart. Put fijicrete in beteeeen and rebuild it or zip tie then shove fijicrete into all the cracks that connect?
|
Fijicrete between rocks then zip tie it and add more fijicrete to the joint and let cure for 24 hours before moving to display. I built mine in rubbermaid tub and filled it with water after to keep rocks live with minimal dieoff while it cured. And yes just masonry bit in a regular drill.