I told this was going to be slow moving! lol
The cabinets should be in town this coming week, then I have to wait for install. I have started to prep for install now.
First coat of mold/mildew resistint paint:
Bubble Master 250 breaking in:
Water change station:
RO/DI
Two of my pendants, return pump, closed loop pump, and the second chamber from my calcium reactor..
Exhaust fan wired to a humidistat:
Next step after paint this afternoon is to pull the carpet back then install a rubber baseboard along the wall to prevent water from wicking into the drywall should I have a spill.