View Single Post
  #8  
Old 08-21-2008, 04:11 AM
fkshiu's Avatar
fkshiu fkshiu is offline
Member
 
Join Date: Sep 2005
Location: Vancouver, BC
Posts: 1,499
fkshiu is on a distinguished road
Default

Quote:
Originally Posted by mseepman View Post
Well, I did some dry fitting of my Herbie plumbing today and was hoping for some input to make sure that I haven't screwed anything up.



The rear pipe would be my emergency overflow pipe. I left it high so that I will hear it if water starts needing to use this pipe. The front pipe has a gate valve for adjustment and a union so that I can take it apart if I need to.

Please give me your opinion.

I would actually have the emergency drain go all the way down into the sump water. A Herbie seems to work best when there's is just a trickle of water going down the emergency drain. As well, barometric pressure can cause the water level in the overflow to vary over the course of a day which will sometimes cause a trickle to go down the emergency drain. Having the emergency drain that high would cause a lot of unnecessary splashing and salt creep. If your main drain is clogged, the massive flushing sound from the emergency drain going full bore will be more than than enough to alert you to an issue.
Reply With Quote