Sump is almost done, water test tomorrow. Tank is on the stand with 3/4" birch and 1/2" styro underneith. 1/2" plywood on the bottom shelf now just have to get styro cut for under the sump. Pic will be added as soon as Terry get's conected back to the net. Next step is the plumbing.
|