View Single Post
  #25  
Old 02-13-2012, 10:04 PM
braid11 braid11 is offline
Member
 
Join Date: Nov 2005
Location: Whistler/North Shore BC
Posts: 31
braid11 is on a distinguished road
Default

So, I bought the big hammerhead in order to both feed the DT, and to tee off the return line to feed a fuge, and possibly a carbon Reactor, and a UV unit. I can see that would make dialing in the system very very tricky.

I have the tee in there, shut off for now with a TUBV.

May have to just feed the fuge off this, and nothing else.

molotov, those 1" gate valves aren't too pricey. I am finding it very usefull to mark the valve with a magic marker, and turn 1/8 or so at a time, on both the pump return and the drain. I had planned on using the TUBV only on the fuge, but another gate valve will definitely go in there.

Tom
Reply With Quote