View Single Post
  #16  
Old 01-20-2010, 03:35 PM
sphelps's Avatar
sphelps sphelps is offline
Member
 
Join Date: May 2006
Location: Lyalta, East of Calgary
Posts: 4,777
sphelps is on a distinguished road
Default

Quote:
Originally Posted by christyf5 View Post
I'm of the understanding that in order to do a Herbie overflow you need two holes drilled. The overflow box doesn't have the space and the tank is already running so that ship has sailed.
You can do a herbie with a single large hole (2") but if you're having issues finding parts for a 2" standpipe then building a single drain herbie will be a much greater challenge. Here's a drawing for reference, if it's really something you want I could probably build it for you and ship it to you.

Reply With Quote