Apex Controller Advice
I'm working on setting up my new Apex unit and am curious about a few things like:
One outlet per heater or one outlet for all?
15A circuit for each Energy Bar?
Separate outlets for each reactor and skimmer?
Any other hints?
I have 2 Energy Bar 8s for under the DT and 1 Energy Bar 4 for my mixing area. I need to find a 50 foot USB cable for between these areas.
The EB4 will power a Mag 12 pump for mixing/transferring, a heater, and a Vertek 100 GPD RO/DI unit. I'm hoping to add a temp probe and salinity probe here later.
The 2 EB8s should be enough to run everything under the DT and lights. A pH probe, temp probe, and conductivity probe will be in the sump.
I will wire up my own cable as a breakout box.
Let me know what ideas you might have on switching things up.
|