View Single Post
  #1  
Old 04-09-2012, 03:58 AM
Madmak's Avatar
Madmak Madmak is offline
Member
 
Join Date: Feb 2012
Location: Chestermere, AB
Posts: 432
Madmak is on a distinguished road
Default Apex Controller Advice

I'm working on setting up my new Apex unit and am curious about a few things like:

One outlet per heater or one outlet for all?

15A circuit for each Energy Bar?

Separate outlets for each reactor and skimmer?

Any other hints?

I have 2 Energy Bar 8s for under the DT and 1 Energy Bar 4 for my mixing area. I need to find a 50 foot USB cable for between these areas.

The EB4 will power a Mag 12 pump for mixing/transferring, a heater, and a Vertek 100 GPD RO/DI unit. I'm hoping to add a temp probe and salinity probe here later.

The 2 EB8s should be enough to run everything under the DT and lights. A pH probe, temp probe, and conductivity probe will be in the sump.

I will wire up my own cable as a breakout box.

Let me know what ideas you might have on switching things up.
Reply With Quote