View Single Post
  #6  
Old 06-23-2015, 04:00 AM
Grayout Grayout is offline
Junior Member
 
Join Date: Aug 2014
Location: Vancouver
Posts: 21
Grayout is on a distinguished road
Default

After the drills were done the sump was slid into place. The chamber on the far right where the overflow water initially returns houses the skimmer, then a chamber for live rock, a chamber for a six inch DSB lagoon and then the return pump chamber with heaters and dual carbon/GFO reactor.
Reply With Quote