View Single Post
  #128  
Old 06-14-2015, 09:35 PM
gregzz4's Avatar
gregzz4 gregzz4 is offline
On Hiatus
 
Join Date: Oct 2011
Location: Burnaby, B.C.
Posts: 4,890
gregzz4 will become famous soon enough
Default

New idea ...

Vertical strips of glass on the left and right ends of the weir say 1/4" thick. These keep the weir running 100% as they will space the acrylic 1/4" away from the back glass (inside the overflow).
Next is some strips @ 90 degrees to the first strips. These hold the ends of the tooth sheet.
And lastly is some vertical strips @ 90 degrees to the second strips. These hold the tooth sheet in place against the second set of strips.

I like this idea so much I'm going to incorporate it into my upcoming build.
Reply With Quote