Both tanks will drain into the Sump... they both have C2C overflows with Durso standpipes...
So the Ehiem will be used as a return for both tanks....
I also plan on using the pump for media reactors off a manifold.
thanks for your input.
I'll post pictures tonight... I have the returns already plumbed. Just need a pump to get going.
Quote:
Originally Posted by WarDog
Are you planning the top tank to drain into the lower tank then into the sump, with the return back up to the top tank? I'm trying to visualize your idea.
|