Got a bit of time to work on the room over the weekend. Finished cleaning it all out and prepped for framing.
The floor is not all that smooth or level, but my ceiling height is only 6' 2" or so, so I won't be levelling it any. I do have a bunch of tile left over from another job, so I may end up tiling it, but that's it. And I got almost all my walls framed up. I still have to fir out the wall where the SW and FW tanks will sit, then run all my plumbing, wiring, insulation and vapour barrier.