Hmmm.
3/4" ID tubing, going from the mag 7 in the sump to the chiller (about 2' run) then from the chiller to the UV unit (16-18" run) and then from the UV to the sump (2.5' run).
I really didnt think my last post thru very well
I should measure the output of that.