
08-03-2004, 06:41 PM
|
 |
Member
|
|
|
Join Date: Mar 2002
Location: Water Valley, AB
Posts: 1,280
|
|
Quote:
Originally Posted by jgoldsney
Mitch....
The floor underneath the tank is reenforced I had the framer double up the TGI joists and the joists are supported by a wall that is right under the front of the tank.
I have also added 2x2's that are cut to fit inside the verticle posts so that when I get the bottom plywood installed it should hold water.
this should stiffen things up quite a bit
Joel
|
...  ...
Thinking ahead.....
Mitch
|