Mitch....
The floor underneath the tank is reenforced I had the framer double up the TGI joists and the joists are supported by a wall that is right under the front of the tank.
I have also added 2x2's that are cut to fit inside the verticle posts so that when I get the bottom plywood installed it should hold water.
this should stiffen things up quite a bit
Joel
|