View Single Post
  #19  
Old 01-27-2013, 11:30 PM
Phil Phil is offline
Member
 
Join Date: Apr 2012
Location: Spruce grove
Posts: 328
Phil is on a distinguished road
Default

return pump plumbed 1" true union ball valve into header with 1/2 gates to run my reactors. then a check valve.
1" come up to a tee then 1" gate valves into my line lock returns. put a few unions in so i can dissasemble it if needed.

1 1/2 drain line done just with 2 45s. left the rest to do when there water in the tank so i can test for sound differances.
Reply With Quote