View Single Post
  #17  
Old 01-27-2013, 03:55 AM
Phil Phil is offline
Member
 
Join Date: Apr 2012
Location: Spruce grove
Posts: 328
Phil is on a distinguished road
Default

so got my brs order friday and the went to rona today to get some fittings

gate valves, true union ball valves, and check valve + fitings

the grizz stoped by and i got two tlf 150 reactors off him.

so heres my starting point off my return pump

i then made this header to come off it. i teed off and reduced to 1/2 inch with gate valves to feed the reactors and installed a 1" check valve to {hopefully} stop anywater from coming back into my sump in a power outage.

heres my return bulkheads that i have to pipe too im going to put gate valves on each line to control the flow on each.

i forgot a few fittings today so hopefully get them tomorow to finninsh up.
Reply With Quote