Lol good eye I had a apprentice at work cut all the tube on a band saw. I told him what I wanted 4-36",4-24" peices and what was left leave for the legs. He forgot and cut two of the leg peices so I had to weld them back together. I was going to sandblast it and paint it but I ran out of time. It onley cost me $70 bucks for the steel and 30 for the plywood
|