View Single Post
  #18  
Old 05-25-2012, 06:06 PM
tinman tinman is offline
Member
 
Join Date: Dec 2009
Location: calgary
Posts: 141
tinman is on a distinguished road
Default apex

if you go full blown apex you can do top off and tunze 6055 pumps or any tunze controllable units with the cables supplied by neptune or add the wireless unit for the vortech all work very well for me
if you go apex lite you need to add the vdm for the tunze and any 0-10 volt control but you can still do top off with a float switch or 2 depending on how you set it up.

Last edited by tinman; 05-25-2012 at 06:10 PM. Reason: missing info
Reply With Quote