Heatsink is in, went with a solid piece 6 feet long 
 
For the LEDs I decided im going to use myself as a genuine pig for a new board design we are working on.  I should have the new board within the next two months.  Once I have the LEDs on the new board, it will literally be a 30min install process. 
 
I will be going with the new XM-Ls NW/CW and XP-E RB. 
		
	
		
		
		
		
			
		
		
		
		
	
		
		
	
	
	 |