View Single Post
  #164  
Old 04-09-2010, 02:33 PM
The Grizz's Avatar
The Grizz The Grizz is offline
Member
 
Join Date: Oct 2009
Location: 15 min NE of Red Deer
Posts: 5,470
The Grizz will become famous soon enough
Default

Quote:
Originally Posted by untamed View Post
I was just looking at your last plumbing shots of the OM4way. I very sad to tell you that you need to tear apart the plumbing that runs from the OM4ways to the valves and insert some unions in there. You have unions above the valves...but you need to have them between the valves and the OM4way as well.

Also, ensure that on the input side of the new pump it should be similar...valve, then union, then pump.

You need to be able to remove the pump and OM4way completely from the system for maintenance. The way you currently have it plumbed you won't be able to do that once it is full of water.
I have valve's in place so that I can kill the flow and pull out the pump's and the 4 way, the picture you where looking at was a test plumbing and nothing was glued together.
__________________
Feed the bear goodies, make a new friend, don't feed the bear...............

8' - 165gal Reef
DIY LED's Build
2012 Nano Contest Winner
Febuary 2013 POTM Winner
300 gal + 60 gal Complete DIY Build
Reply With Quote