Anyhow, more pictures!
Next up was to build some wall framing and hang a door for access into the tank room.
Seems that maybe not going about things the easiest way, but, I want walls to be flush, or near to flush with the tank, as opposed to having the walls a 2x4 thickess out from the tank.
Also, I wanted to avoid the usual "picture frame" look to a typical inwall tank because my favourite tanks are those that can be looked at from multiple angles. Ideally, if I had had the space, I would have made three sides viewable, but unfortunately I just don't have enough space to pull it off ... so the end result is the best compromise I could do, a "front and right-hand side viewable" tank.
As you can see, I haven't bothered draining the tank yet from my "verify the tank is level" step.
![#redface](images/smilies/icon_redface.gif)
That's some skanky water now, but I'm leaving it for now because I'll use it to test my plumbing when I have that ready (hopefully soon). Seems to me there's no need to waste 280g of water in the meantime.
Here's a close up of the furnace piping. "If I knew then what I know now", I'd have sprung for 9' ceilings in the basement. With 8', there are definitely a lot of low spots to work around due to things like this.