![]() |
Wow that is very nice. Inspires me to get mine finished - now if only the electricial would show up to do some re-wiring at my house.
|
Thanks guys.
It took a while, planning was being done before the basement was even dug, but happy with how it turned out. Sump is in the basement with the tank return bulkhead about a 12 foot horizontal run to the pump. Pillars were made by the builder but he got the material from Windsor Plywood (and that's where I got material for hood). |
All times are GMT. The time now is 01:23 PM. |
Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.