Madmak
04-09-2012, 03:58 AM
I'm working on setting up my new Apex unit and am curious about a few things like:
One outlet per heater or one outlet for all?
15A circuit for each Energy Bar?
Separate outlets for each reactor and skimmer?
Any other hints?
I have 2 Energy Bar 8s for under the DT and 1 Energy Bar 4 for my mixing area. I need to find a 50 foot USB cable for between these areas.
The EB4 will power a Mag 12 pump for mixing/transferring, a heater, and a Vertek 100 GPD RO/DI unit. I'm hoping to add a temp probe and salinity probe here later.
The 2 EB8s should be enough to run everything under the DT and lights. A pH probe, temp probe, and conductivity probe will be in the sump.
I will wire up my own cable as a breakout box.
Let me know what ideas you might have on switching things up.
One outlet per heater or one outlet for all?
15A circuit for each Energy Bar?
Separate outlets for each reactor and skimmer?
Any other hints?
I have 2 Energy Bar 8s for under the DT and 1 Energy Bar 4 for my mixing area. I need to find a 50 foot USB cable for between these areas.
The EB4 will power a Mag 12 pump for mixing/transferring, a heater, and a Vertek 100 GPD RO/DI unit. I'm hoping to add a temp probe and salinity probe here later.
The 2 EB8s should be enough to run everything under the DT and lights. A pH probe, temp probe, and conductivity probe will be in the sump.
I will wire up my own cable as a breakout box.
Let me know what ideas you might have on switching things up.